Skysun Dev 1 - Stockage BESS
EN
Enerfip Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Skysun Dev 1 - Stockage BESS

Average
64
score / 100
Yield
8.5%/yr
Duration
36 months
Min. ticket
50 €
Amount raised
2 M€
Invest →
À propos

Financing of development of a portfolio of 33 BESS (Battery Energy Storage System) projects located in France, held by Skysun Devco 1. The projects have a total capacity of 95 MWn / 190 MWh and are at development stage, with RTB scheduled Q2 2027. Bullet simple obligation of 2 m€ at 8.50% over 3 years, secured by first ranking pledge of Skysun Devco 1 securities.

Plateforme · 23.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF currently valid, fonds propres-2022-2 licence verified
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default rate 0.00% → 6/6
  • Delay rate 0.32% (<5%) → 6/6
  • Average realised return 7.95% compliant with announced renewable energy range (5-9%) → 6/6
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 3.0/4bon
  • Documented selection process (published risk score 2/5, internal committee), but overall selection rate not explicitly published
  • Leading renewable energy platform in France since 2014, 537 projects financed
A4 · Santé financière 3.0/4bon
  • Independent profitable platform (net income approximately 600K€ 2022), more than 10 years in existence, 30-50 employees, consistent growth
  • Acquisition of Lumo end of 2025
  • No listed institutional shareholder → 3 points vs 4 points for group subsidiary
A5 · Protection investisseurs 3.0/3✓ max
  • agrément AMF licence → reflection period 4 days plus mandatory continuity plan (1 point)
  • Segregated accounts required by agrément AMF status (1 point)
  • Enerdeal secondary market operational since 2023 (1 point)
Projet · 41.0/75
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5 - Simple obligations under French law, clear structure
B1.2: 3/3 - Dedicated société dédiée (SPV) Skysun Devco 1, issuer distinct from operator
B1.3: 1/2 - Senior ranking claimed, pledge of securities not yet formally registered
B2 · Opérateur & Track record 8.0/15
B2.1: 4/4 - Appointed managers (Coppieters, Dawans), identifiable LinkedIn profiles
B2.2: 2/5 - IPP founded 2017, 8 years track record, BESS started 2025, 0 MWn BESS connected to date
B2.3: 1/3 - First operation on Enerfip, ongoing 1.24 m€ with no reported incident
B2.4: 1/3 - Skysun Grand Est balance sheet strained (equity 549k€, liabilities 611k€), institutional raise of 17 m€ sound but young structure
B3 · Garanties & Sûretés 8.0/15
B3.1: 6/9 - First ranking pledge of Skysun Devco 1 securities registered
B3.2: 1/4 - Skysun Grand Est equity ~549k€, high gearing; consolidated holding with Andera Partners but limited consolidated data
B3.3: 1/2 - No long-term bank credit identified; bank refinancing RTB envisaged but not signed
B4 · Structure financière 8.0/15
B4.1: 4/5 - Loan-to-Value (ratio prêt/valeur actif) 50% on RTB valuation 85k€/MWn (total ~8.1m€ vs 2m€ crowd) - conservative ratio
B4.2: 2/4 - Operator equity contribution not precisely quantified; institutional raise of 17m€ strengthens base
B4.3: 1/4 - No stress test presented; Loan-to-Value (ratio prêt/valeur actif) 50% partially compensates
B4.4: 1/2 - Revenues not contractualised, merchant/floor mix mode to be determined
B5 · Pré-commercialisation 4.0/10faible
  • Projects under development: 48% permits obtained, 88% filed, only 3% connection secured (PTF)
  • No PPA signed
  • Advanced development phase but substantial connection risk
  • ENERGY grid: permits partially obtained, PPA absent → 4 points
B6 · Permis & Maturité 2.0/5faible
  • 48% of projects with permits obtained, 88% filed, but connection critical: only 3% PTF obtained
  • Development phase, commissioning Q4 2027
  • ENERGY grid: permits under instruction/partially obtained → 2-3 points
B7 · Marché & Localisation 2.0/3
  • French BESS market in strong structural growth (shift to 15 minute settlement, renewables growth)
  • Score adjusted thanks to live data: rising market, French BESS pipeline underdeveloped vs European neighbours, real opportunity confirmed
  • Non-contractualised revenues → 2/3
Points forts
✓First ranking pledge of Skysun Devco 1 securities, clear legal structure.
✓Strong institutional backing: Andera Partners, BNP Paribas, Crédit Agricole (17 m€ raised in 2024).
✓Conservative LTV at 50% on documented RTB valuation.
✓French BESS market in structural growth, shift to 15 minute settlement favourable.
✓Enerfip platform excellent: zero defaults, PSFP licence, impeccable renewables track record.
Risques identifiés
!High development risk: only 3% of projects with secured connection (PTF obtained).
!No PPA or signed revenue contracts; remuneration mode still to be contractualised.
!BESS track record non-existent: activity started in 2025, 0 MWn connected to date.
!Bank refinancing on exit not secured as of date; depends on market conditions 2027.
!Skysun Grand Est equity weak (~549k€); financial soundness rests on consolidated holding.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.