← Retour aux projets
MCEL NOVA SPARK
EN
Enerfip Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

MCEL NOVA SPARK

Average
58
score / 100
Yield
8.0%/yr
Duration
48 months
Min. ticket
50 €
Amount raised
1 M€
Invest →
À propos

Mezzanine financing of a portfolio of 5 photovoltaic canopies and 1 ground-mounted photovoltaic project for total capacity of 6,011 MWc, held by MCEL NOVA SPARK (subsidiary of MCEL ENERGY). Financing is in two tranches, the first tranche targeting 1,035,000€ out of 1,700,000€ total. Projects are at various stages: one in COD (Petit Renard), four in RTB, one in development (Camping Cars).

Plateforme · 21.0/25
A1 · Statut réglementaire 8.0/8✓ max

Enerfip holds AMF licence agrément AMF fonds propres-2022-2 currently valid (verified against AMF register)

A2 · Track Record 6.0/6✓ max
  • Score adjusted based on live data: default rate 0.0%, delay rate 0.5%, target IRR consistent with announcements
  • Exceptional ENR history → 6/6
A3 · Rigueur de sélection 3.0/4bon
  • Selection process documented with internal committee and technical/financial analysis
  • Selection rate not published
A4 · Santé financière 3.0/4bon
  • Score adjusted based on live data: platform profitable (€773K profit 2024), >7 years existence, healthy growth €700M+ financed, no distress signal
  • Lumo acquisition 2025 strengthens position
A5 · Protection investisseurs 1.0/3faible
  • 4-day cooling-off period mandatory for agrément AMF (1 point minimum)
  • No secondary market mentioned
  • Segregated accounts not documented
Projet · 37.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple obligations fixed rate, clear French law
B1.2: 2/3 - Direct issuer MCEL NOVA SPARK, French law, no separate dedicated société dédiée (SPV)
B1.3: 1/2 - Senior rank claimed, pledge of shares, no documented senior debt
B2 · Opérateur & Track record 5.0/15faible
B2.1: 2/4 - Nicolas Douchet and Maarten de Haas appointed, CVs in annex, profiles not publicly verified
B2.2: 2/5 - MCEL Energy founded 2025, experienced renewable energy team claimed, 0 MW connected documented
B2.3: 0/3 - First platform transaction
B2.4: 1/3 - Company registered Nov 2025, no accounts available, judicial verification impossible
B3 · Garanties & Sûretés 8.0/15
B3.1: 6/9 - Pledge of securities account on MCEL ENERGY shares (first rank), no mortgage
B3.2: 1/4 - MCEL Energy founded 2025, no accounts available, financial soundness not assessable
B3.3: 1/2 - Bank loan mentioned on two SPVs (TS012NONT, TS173CHAU) without bank name specified
B4 · Structure financière 5.0/15faible
B4.1: 2/5 - Mix of projects COD/RTB/DEV, IRR not communicated, PPAs not documented in file
B4.2: 0/4 - Equity committed not disclosed (explicit N/A)
B4.3: 1/4 - No stress test presented, Loan-to-Cost (ratio prêt/coût total)/Loan-to-Value (ratio prêt/valeur actif) unavailable
B4.4: 2/2 - Regulated renewable energy rates applicable if projects connected (COD/RTB)
B5 · Pré-commercialisation 6.0/10
  • 1 project in COD (connected), 4 in RTB (construction-ready), 1 in DEV (application filed)
  • Purge of challenge periods not confirmed
  • No PPA documented
  • Regulated rate applicable to RTB/COD subject to conditions
B6 · Permis & Maturité 3.0/5
  • Petit Renard in COD (connected, 499 kWc)
  • Four RTB projects (permits obtained, construction not started)
  • One DEV project (application filed)
  • Purge of challenge periods not confirmed
B7 · Marché & Localisation 2.0/3
  • French photovoltaic renewable energy market in sustained growth, regulated rates stable
  • Favourable context despite increased competition
  • Office market rating not applicable (ENERGY)
⚠ Alertes détectées · −0 pts déduits
Alerte −0 pts

Company registered Nov 2025, no accounts available. guarantor soundness not assessable (risk noted B3.2).

Points forts
✓Simple obligations senior rank, first rank pledge of shares constituted.
✓One project already in COD (connected), four in RTB. real operational progress.
✓Enerfip platform recognised, zero historical default on renewable energy projects.
✓Bank loan mentioned on two SPVs. partial bank validation.
✓Rate 8% per annum compliant with renewable energy standard, regulated rates applicable.
Risques identifiés
!Issuer company registered November 2025, no accounts or track record available.
!Equity committed not disclosed (explicit N/A in file).
!PPAs and electricity sales contracts not documented for RTB/DEV projects.
!Financial soundness of MCEL Energy (pledge guarantor) not verifiable.
!One project in DEV phase only (application filed, not obtained) included in portfolio.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.