À propos

Construction of a 400 kW hydroelectric power station on the Moulin de Bénavent site at Pouligny-Saint-Pierre (Indre, 36), carried out by SPV HEPSP, subsidiary of Pouligny-Saint-Pierre Municipality and renewable energy developer SEIDER. Project ready to build with EDF H16 Bis tariff over 20 years secured, but environmental licence subject to contentious proceedings before Limoges administrative court. Second tranche of 750,000 € out of total fundraising of 2.25 M€ in two tranches, repayment in fine at 36 months.

Plateforme · 22.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence granted by AMF on 6 December 2022 (fonds propres-2022-2), registre ORIAS n°15003274
  • Status fully compliant, currently valid
A2 · Track Record 6.0/6✓ max
  • Default 0.8% (<1% → 6 pts×0.5=3.0)
  • Delay 0.8% (<5% → 6 pts×0.3=1.8)
  • Realised yield ~5.9% compliant with announced ranges → 6 pts×0.2=1.2
A3 · Rigueur de sélection 3.0/4bon
  • RES selection process documented and recognised (technical, legal, financial due diligence)
  • Selection rate not explicitly published in available data
A4 · Santé financière 3.0/4bon
  • Independent platform founded in 2014 (>10 years), no distress signals
  • Active European expansion (Spain, Italy, Netherlands)
  • Fund launch 2026
  • No direct institutional backing
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → mandatory 4-day reflection period + continuity plan (1 pt)
  • Segregated accounts via third-party payment service provider Mangopay (1 pt)
  • No operational secondary market identified (0 pt)
Projet · 49.0/75
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5 - Simple obligations at fixed rate, French law
B1.2: 3/3 - Dedicated société dédiée (SPV) HEPSP, distinct issuer, clear French law
B1.3: 1/2 - Senior ranking claimed, pledge of securities but no mortgage on energy asset registered
B2 · Opérateur & Track record 9.0/15
B2.1: 4/4 - Didier BOUREAUD appointed, identifiable LinkedIn profile, roles specified
B2.2: 3/5 - SEIDER: >45 MWp wind built, confirmed renewable energy expertise, 0 MW hydroelectric connected
B2.3: 1/3 - First HEPSP operation on Enerfip (T1 in progress)
B2.4: 2/3 - No proceedings, SEIDER balance sheets healthy, equity 1.9M€, moderate debt ratio
B3 · Garanties & Sûretés 9.0/15
B3.1: 7/9 - SEIDER GAPD (autonomous first-demand guarantee) + first-ranking pledge 100% HEPSP securities + turbine pledge
B3.2: 1/4 - SEIDER: Equity 1.9M€, low gearing (~0.35), but GAPD outstanding 1.24M€ and limited capacity
B3.3: 1/2 - No identified bank partner; near-total bond financing (80%)
B4 · Structure financière 9.0/15
B4.1: 4/5 - EDF H16bis tariff over 20 years secured, project IRR estimated within renewable energy norms with long-term PPA
B4.2: 2/4 - CCA contribution 550k€ i.e. ~18% of total cost (threshold 10-15%)
B4.3: 2/4 - Tariff guaranteed 20 years covers debt service; stress test not presented but PPA secures
B4.4: 1/2 - Estimated taux de couverture de la dette 1.2-1.5 on contracted revenues at 8%/year
B5 · Pré-commercialisation 8.0/10bon
  • EDF H16bis sales tariff over 20 years signed and secured for 400 kW
  • Permit fully cleared not confirmed (contentious proceedings ongoing)
  • Score: permit obtained + applicable regulated tariff → 8/10
B6 · Permis & Maturité 3.0/5
  • Environmental licence obtained but subject to contentious proceedings (Limoges court decision expected early 2028)
  • Ready-to-build stage confirmed
  • Construction not blocked by proceedings, but residual legal risk → 3/5
B7 · Marché & Localisation 2.0/3
  • France renewable energy market in growth (PPE3 adopted Feb
  • 2026, H16bis regulated tariff secured)
  • Temporary overcapacity risk signalled by RTE
  • Overall context favourable for hydroelectric
  • Score: established market with contractualised tariff → 2/3
Points forts
✓EDF H16bis tariff over 20 years secured for 400 kW, maximum revenue visibility.
✓SEIDER GAPD + first-ranking pledge 100% HEPSP securities provide multi-level coverage.
✓SEIDER: experienced renewable energy developer, >45 MWp built, healthy balance sheets.
✓Dedicated SPV HEPSP, clear legal structure, simple obligations French law.
✓Enerfip: PSFP licensed platform, zero historical renewable energy default, excellent track record.
Risques identifiés
!Environmental licence subject to contentious proceedings, court decision expected early 2028.
!SEIDER: GAPD guarantor with limited equity (1.9M€) against commitment of 750k€ (T2) + 1.5M€ (T1).
!No identified bank partner, financing 80% by bond debt without external bank validation.
!HEPSP created in 2022, no operational history or revenues generated at this stage.
!Hydrological risk documented (droughts) capable of impacting output and profitability.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.