Voltaire ENR — CRE GH-015
EN
Enerfip Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Voltaire ENR — CRE GH-015

Strong
70
score / 100
Yield
7.0%/yr
Duration
36 months
Min. ticket
10 €
Amount raised
108 k€
Invest →
À propos

Refinancing of equity (10% of CAPEX) for a 842 kWc roof-mounted photovoltaic facility, operational since March 2026, located in Mont-de-Marsan in Landes (40). The issuer is Voltaire ENR, subsidiary of Watt & Co group, renewable energy developer founded in 2009. Simple bullet obligation over 3 years at 7% rate, unsecured, with CRE tariff secured at 90.5€/MWh over 20 years.

Plateforme · 23.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF currently valid, fonds propres-2022-2 licence verified
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default rate 0.00% → 6/6
  • Delay rate 0.32% (<5%) → 6/6
  • Average realised return 7.95% compliant with announced renewable energy range (5-9%) → 6/6
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 3.0/4bon
  • Documented selection process (published risk score 2/5, internal committee), but overall selection rate not explicitly published
  • Leading renewable energy platform in France since 2014, 537 projects financed
A4 · Santé financière 3.0/4bon
  • Independent profitable platform (net income approximately 600K€ 2022), more than 10 years in existence, 30-50 employees, consistent growth
  • Acquisition of Lumo end of 2025
  • No listed institutional shareholder → 3 points vs 4 points for group subsidiary
A5 · Protection investisseurs 3.0/3✓ max
  • agrément AMF licence → reflection period 4 days plus mandatory continuity plan (1 point)
  • Segregated accounts required by agrément AMF status (1 point)
  • Enerdeal secondary market operational since 2023 (1 point)
Projet · 47.0/75 (52.0 brut, red flags −5)
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple obligation fixed rate, clear French law
B1.2: 2/3 - Direct loan Voltaire ENR (société dédiée (SPV) subsidiary), no separate dedicated société dédiée (SPV)
B1.3: 1/2 - Junior rank declared, no senior debt formally documented
B2 · Opérateur & Track record 11.0/15
B2.1: 4/4 - Judith Escande appointed, Didier/Arthur Jimenez identified publicly
B2.2: 4/5 - Watt & Co founded 2009, 230 MW in operation/construction, solid track record
B2.3: 2/3 - Enerfip outstanding 15M€, prior operations with no incident reported
B2.4: 1/3 - Voltaire ENR fonds propres 262K€ only, gearing >100x; solid group holding but société dédiée (SPV) highly leveraged
B3 · Garanties & Sûretés 2.0/15faible
B3.1: 0/9 - No security explicitly documented
B3.2: 0/4 - No guarantor formally identified
B3.3: 2/2 - Senior bank financing documented (TCMA), banking partners present
B4 · Structure financière 14.0/15bon
B4.1: 5/5 - Operational project, PPA 90.5€/MWh over 20 years CRE, solid project IRR
B4.2: 4/4 - Crowd = 10% CAPEX; 90% senior bank financing, equity contribution compliant
B4.3: 3/4 - 20-year guaranteed tariff protects against price volatility; stress test not formalised
B4.4: 2/2 - taux de couverture de la dette >1.5 on CRE contractualised revenues estimated
B5 · Pré-commercialisation 10.0/10✓ max
  • Operational project since March 2026, permits cleared, network connection completed, 20-year CRE PPA signed at 90.5€/MWh
  • Roof emphyteutic lease secured
  • Maximum ENERGY score
B6 · Permis & Maturité 5.0/5✓ max
  • Planning permission obtained November 2022, prior notification filed August 2022, network connection confirmed March 2025, project operational March 2026
  • All permits cleared
B7 · Marché & Localisation 2.0/3
  • French renewable energy market in growth (trend: rising), secured CRE tariff eliminates market price risk
  • Network constraints and electricity price volatility noted → 2/3
⚠ Alertes détectées · −5 pts déduits
Aucune garantie réelle sur ce projet −5 pts

No real or personal security documented on this 108K€ bond transaction - no mortgage, pledge or joint and several guarantee.

Points forts
✓Operational photovoltaic project since March 2026, construction risk nil.
✓CRE tariff guaranteed 90.5€/MWh over 20 years, revenues fully secured.
✓Watt & Co group solid: +100 employees, 230 MW operational/construction.
✓Senior bank financing (90% CAPEX) validates the project independently.
✓Enerfip platform renewable energy leader, zero historical default, PSFP licence.
Risques identifiés
!No security retained for this transaction - investor unprotected in case of default.
!Voltaire ENR equity very weak (262K€) against 43M€ balance sheet (extreme gearing).
!Junior rank of obligations in case of insolvency - repayment subordinated to senior debt.
!Network constraints and electricity price volatility noted on renewable energy market 2026.
!Very low amount (108K€): limited liquidity on Enerdeal secondary market.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.