← Retour aux projets
ONEMW - Boucles locales T3
EN
Enerfip Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

ONEMW - Boucles locales T3

Average
59
score / 100
Yield
8.5%/yr
Duration
48 months
Min. ticket
10 €
Amount raised
500 k€
Invest →
À propos

Financing of development of a portfolio of 21 ground-mounted photovoltaic projects (<1 MW each) with total capacity of 29.3 MWc, located in France (South-East, Occitanie, Centre regions). Operator OneMW, company created July 2024, first fundraising on Enerfip. Simple bonds bullet at 8.5%/year over 48 months, issued via SPV2 ONEMW, with 1st ranking pledge on issuer shares. Tranche T3: 300,000 € out of total 1,000,000 €.

Plateforme · 23.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF currently valid, fonds propres-2022-2 licence verified
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default rate 0.00% → 6/6
  • Delay rate 0.32% (<5%) → 6/6
  • Average realised return 7.95% compliant with announced renewable energy range (5-9%) → 6/6
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 3.0/4bon
  • Documented selection process (published risk score 2/5, internal committee), but overall selection rate not explicitly published
  • Leading renewable energy platform in France since 2014, 537 projects financed
A4 · Santé financière 3.0/4bon
  • Independent profitable platform (net income approximately 600K€ 2022), more than 10 years in existence, 30-50 employees, consistent growth
  • Acquisition of Lumo end of 2025
  • No listed institutional shareholder → 3 points vs 4 points for group subsidiary
A5 · Protection investisseurs 3.0/3✓ max
  • agrément AMF licence → reflection period 4 days plus mandatory continuity plan (1 point)
  • Segregated accounts required by agrément AMF status (1 point)
  • Enerdeal secondary market operational since 2023 (1 point)
Projet · 36.0/75
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5 - Simple bonds fixed rate, French law
B1.2: 3/3 - SPV2 ONEMW dedicated, distinct issuer, clear French law
B1.3: 1/2 - Senior ranking claimed, pledge not yet formally registered
B2 · Opérateur & Track record 7.0/15faible
B2.1: 4/4 - Named managers (Le Guennec, Vanackere, Moine), CVs attached, identifiable
B2.2: 1/5 - Company created July 2024, 0 MW connected, >10 years sector experience declared but 1st transaction
B2.3: 0/3 - 1st fundraising on Enerfip, no track record
B2.4: 2/3 - No proceedings identified, recent company without consolidated accounts
B3 · Garanties & Sûretés 7.0/15faible
B3.1: 6/9 - 1st ranking pledge of SPV2 ONEMW shares, project rights transferred under suspensive condition
B3.2: 1/4 - Company created 2024, fonds propres not documented, balance sheet non-existent
B3.3: 0/2 - No banking partner, project <2M€
B4 · Structure financière 7.0/15faible
B4.1: 4/5 - Loan-to-Value (ratio prêt/valeur actif) agreed 28% (threshold <30%), portfolio valuation 3,516M€ for 1M€ raised
B4.2: 0/4 - No equity committed by operator
B4.3: 2/4 - Very low Loan-to-Cost (ratio prêt/coût total) (<30%) offsets absence of formalised stress test
B4.4: 1/2 - taux de couverture de la dette not precisely calculable, positive EBITDA from 2026 per BP
B5 · Pré-commercialisation 2.0/10faible
  • Pure development phase, no PPA signed, no permit cleared, no confirmed connection
  • Some authorisations obtained (projects 1, 3, 4, 10) but majority in development or securing phase
  • Enerfip B- rating confirms low maturity
B6 · Permis & Maturité 2.0/5faible
  • Several projects with prior declaration obtained (projects 1, 3, 4, 10) but no permit cleared nor network connection confirmed
  • Majority of 21 projects still in development phase or land security
B7 · Marché & Localisation 2.0/3
  • French renewable energy market in structural growth, policy favourable to projects <1MW via decree 2022-1688
  • CRE auction mechanism and open window operational
  • Stable demand, favourable regulatory context
Points forts
✓Very low portfolio LTV at 28%, pledge on 100% of SPV shares.
✓Enerfip platform reference for renewables with zero historical default.
✓Strategy <1MW reducing regulatory constraints and lead times.
✓Minimum ticket 10€, simple senior bonds, clear French law.
✓Pipeline of 60 MWc in development, of which 25 MWc signed (PDB).
Risques identifiés
!Company created July 2024, no project delivered nor MWc connected to date.
!Repayment depends on non-guaranteed bank refinancing or RTB project sale.
!No equity committed by operator in the transaction.
!Majority of 21 projects in development phase or land security without final authorisations.
!Interest payment financed by a reserve drawn from the fundraising itself.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.