← Retour aux projets
Projet Solaire de Courchelettes-Corbehem
LE
Lendosphere Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Projet Solaire de Courchelettes-Corbehem

Strong
74
score / 100
Yield
7%/yr
Duration
54 months
Min. ticket
—
Amount raised
960 k€
Invest →
À propos

Creation of a 10.65 MWc photovoltaic solar park on an 8 hectare industrial brownfield site at Courchelettes and Corbehem (Nord/Pas-de-Calais), 5 km from Douai. Operator TSE, independent solar energy producer founded in 2016, Courchelettes PV subsidiary held 51% by TSE and 49% by Banque des Territoires and Crédit Mutuel Impact. Construction commenced in April 2026, secured 20 year sale rate via CRE PPE2 contract.

Plateforme · 20.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Also registered statut réglementaire CIP and IFP with registre ORIAS
  • Maximum regulatory status achieved
A2 · Track Record 5.0/6bon
  • Default 0.0% → 6/6
  • Delay 0.35% (<5%) → 6/6
  • Actual vs announced return not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8 → rounded to 5
A3 · Rigueur de sélection 2.0/4
  • Selection process mentioned implicitly (700 fundraisings over €400M, 0% default)
  • Selection rate not explicitly published in available data
A4 · Santé financière 3.0/4bon
  • Backed by 123 Investment Managers group since 2021, >10 years in existence (founded 2014), healthy growth, no platform distress signal
  • Non-listed institutional group → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → 4-day reflection period + mandatory continuity plan (1 pt)
  • Lendopolis acquisition November 2024 suggests segregated payment infrastructure (1 pt)
  • Secondary market not documented (0 pt)
Projet · 54.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple bond fixed rate, French law
B1.2: 2/3 - société dédiée (SPV) Courchelettes PV dedicated, documented TSE subsidiary
B1.3: 1/2 - Simple bond without known senior debt, de facto ranking not registered
B2 · Opérateur & Track record 13.0/15bon
B2.1: 4/4 - Mathieu Debonnet and Pierre-Yves Lambert appointed, LinkedIn verifiable
B2.2: 5/5 - TSE >50 MWc operated (152 MWc Marville, 2.7 GWc in development)
B2.3: 2/3 - Previous Lendosphere operations not detailed, national reputation verified
B2.4: 2/3 - Balance sheet not provided but 130M€ raised from Eurazeo/CA/BPI 2023, no collective insolvency proceeding identified
B3 · Garanties & Sûretés 6.0/15faible
B3.1: 5/9 - Joint and several guarantee TSE group not explicitly documented; shareholders Banque des Territoires and Crédit Mutuel Impact present but formal guarantee absent
B3.2: 1/4 - société dédiée (SPV) balance sheet not provided, partial information
B3.3: 0/2 - No bank credit identified in the file
B4 · Structure financière 12.0/15bon
B4.1: 4/5 - Target IRR not specified, secured CRE rate 20 years (PPE2) equivalent to PPA → 4 pts
B4.2: 4/4 - société dédiée (SPV) subsidiary TSE with institutional shareholders (Banque des Territoires, Crédit Mutuel Impact), capitalised contribution
B4.3: 2/4 - Contractualised revenues 20 years limit stress, but no stress test documented in the file; low Loan-to-Cost (ratio prêt/coût total) crowd partially compensates
B4.4: 2/2 - Regulated rate secured 20 years, expected solid taux de couverture de la dette on contractual revenues
B5 · Pré-commercialisation 8.0/10bon
  • Licence purged + connection confirmed + PPE2 laureate + signed CRE rate 20 years → complementary remuneration contract equivalent to long-term PPA
  • Construction commenced April 2026
B6 · Permis & Maturité 5.0/5✓ max
  • All licences obtained, connection agreement signed, construction commenced in April 2026
  • Most advanced stage reached
B7 · Marché & Localisation 2.0/3
  • Growing renewable energy market in France, secured CRE rate
  • Underlying slowdown in new projects and network constraints noted; established market → 2 pts
Points forts
✓CRE rate secured for 20 years (PPE2 complementary remuneration contract), commercial risk almost null.
✓TSE major French operator (>50 MWc operated, 130M€ raised from Eurazeo/CA/BPI).
✓Institutional shareholders in the SPV: Banque des Territoires and Crédit Mutuel Impact.
✓All licences obtained, connection confirmed, construction commenced in April 2026.
✓Lendosphere licensed PSFP AMF FP-2023-22, zero default across entire platform portfolio.
Risques identifiés
!No real guarantee registered (mortgage, pledge) on the SPV or project assets.
!No bank partner identified in the file despite a 10.65 MWc project.
!Courchelettes PV SPV financial statement not communicated, guarantor solvency not verifiable.
!Commissioning scheduled end 2027: risk of construction delay impacting final repayment December 2030.
!Underlying slowdown in French solar market and rising network connection constraints.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.