Projet Photovoltaïque Courtine 2 à Avignon
LE
Lendosphere Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Projet Photovoltaïque Courtine 2 à Avignon

Very Strong
77
score / 100
Yield
6.75%/yr
Duration
48 months
Min. ticket
—
Amount raised
900 k€
Invest →
À propos

Participatory financing for the construction of a ground-mounted photovoltaic plant of 11.26 MWc in the industrial-port zone of Courtine in Avignon (Vaucluse), carried by ENR10, subsidiary of CN'AIR (100% CNR). The project is winner of the CRE PPE2 call for proposals with 20-year purchase contract. Site opened January 2026, commissioning scheduled end of 2026.

Plateforme · 20.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Also registered statut réglementaire CIP and IFP with registre ORIAS
  • Maximum regulatory status achieved
A2 · Track Record 5.0/6bon
  • Default 0.0% → 6/6
  • Delay 0.35% (<5%) → 6/6
  • Actual vs announced return not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8 → rounded to 5
A3 · Rigueur de sélection 2.0/4
  • Selection process mentioned implicitly (700 fundraisings over €400M, 0% default)
  • Selection rate not explicitly published in available data
A4 · Santé financière 3.0/4bon
  • Backed by 123 Investment Managers group since 2021, >10 years in existence (founded 2014), healthy growth, no platform distress signal
  • Non-listed institutional group → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → 4-day reflection period + mandatory continuity plan (1 pt)
  • Lendopolis acquisition November 2024 suggests segregated payment infrastructure (1 pt)
  • Secondary market not documented (0 pt)
Projet · 57.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple bond at fixed rate under French law
B1.2: 2/3 - Dedicated société dédiée (SPV) ENR10, subsidiary of CNR, clear French law
B1.3: 1/2 - Ranking not formally registered, no known senior debt documented
B2 · Opérateur & Track record 13.0/15bon
B2.1: 4/4 - CNR/Vensolair appointed, identifiable public structure
B2.2: 5/5 - Vensolair 1087 MW in operation, 71 solar plants, >10 years
B2.3: 2/3 - CNR present on renewable energy platforms, partial history on Lendosphere
B2.4: 2/3 - CNR public capital/ENGIE, solid balance sheet; ENR10 gearing not verified
B3 · Garanties & Sûretés 7.0/15faible
B3.1: 5/9 - Joint and several guarantee from CN'AIR holding (100% CNR), capitalised by ENGIE public group
B3.2: 3/4 - CNR public group >5M€ equity, solid structure
B3.3: 0/2 - No banking partner identified, project <€2M therefore not RF2
B4 · Structure financière 14.0/15bon
B4.1: 5/5 - CRE 20-year contract obtained, regulated tariff, target IRR renewable solar Avignon estimated >10%
B4.2: 4/4 - CNR/Vensolair carry the investment; crowd €900K on multi-M€ project
B4.3: 3/4 - Fixed 20-year PPA, −20% stress possible; regulated tariff absorbs volatility
B4.4: 2/2 - taux de couverture de la dette >1.5 expected on contracted revenues 20 years
B5 · Pré-commercialisation 8.0/10bon
  • Building permit obtained and cleared (Oct
  • 2024 + public inquiry June-July 2024)
  • Winner of CRE PPE2 call for proposals March 2025 = 20-year purchase contract
  • Grid connection not yet formally confirmed
  • Site opened January 2026
B6 · Permis & Maturité 4.0/5bon
  • Building permit obtained October 2024, public inquiry completed, site opened January 2026
  • Grid connection: application in progress, network confirmation not documented in file
B7 · Marché & Localisation 3.0/3✓ max
  • Avignon: 2700-2800h sunshine/year, among the highest in France
  • Renewable energy market in strong growth (+62% installations)
  • CRE 20-year contract = zero market risk on revenue
Points forts
✓Operator CNR/Vensolair: 1087 MW in operation, majority public capital, ENGIE shareholder.
✓CRE purchase contract over 20 years obtained: commercial risk and sale price secured.
✓Avignon location: 2700-2800h/year of sunshine, yield superior to national average.
✓Building permit obtained and cleared, site opened since January 2026.
✓Lendosphere platform licensed PSFP AMF FP-2023-22, zero historical default.
Risques identifiés
!Formal guarantees limited: CN'AIR joint and several guarantee with no registered mortgage or pledge.
!ENR10 SPV financial structure not detailed; gearing and equity contributions not documented.
!Commissioning November 2026 not yet completed; residual site delay risk.
!No banking partner identified in file for independent external validation.
!Grid connection not formally confirmed by network operator.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.