À propos

Partial financing of the construction of a 4.45 MWp ground-mounted solar plant on a former quarry at Lesperon (Landes), developed by the Enoé group through the project company ENOVA PV 2. The permit is purged of any appeals, the CRE tariff has been secured over 20 years, and construction has been underway since February 2026, with commissioning scheduled for December 2026. These are simple bonds at 7 % over 4 years, repayable in fine, offered through local crowdfunding.

Plateforme · 19.8/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Maximum status on the grid
A2 · Track Record 4.8/6bon
  • Default 0.34% (<1%) → 6/6
  • Delay 0.41% (<5%) → 6/6
  • Actual return vs announced: not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8
A3 · Rigueur de sélection 2.0/4
  • Proven specialisation in renewable energy with €420M raised since 2014
  • No selection rate published nor detailed description of the analysis committee
A4 · Santé financière 3.0/4bon
  • Backed by 123 IM group, 90 employees, operational platform since 2014
  • Acquisition of Lendopolis in 2024 = expansion, not distress
  • Non-listed group/tier 1 institutional → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → reflection period + continuity plan mandatory (1 pt)
  • Third-party escrow account for payments documented (1 pt)
  • No secondary market mentioned (0 pt)
Projet · 35.0/75 (40.0 brut, red flags −5)
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5. Fixed-rate simple bond, French law
B1.2: 3/3. Dedicated société dédiée (SPV) ENOVA PV 2, separate from the group
B1.3: 1/2. Unsecured, no senior debt documented
B2 · Opérateur & Track record 9.0/15
B2.1: 4/4. President and executives appointed with their functions
B2.2: 2/5. 1 GWc pipeline, connected MWc not quantified
B2.3: 1/3. History on Lendosphere not documented
B2.4: 2/3. No proceedings reported, financial statements not provided
B3 · Garanties & Sûretés 0.0/15faible
B3.1: 0/9. No security interest or personal guarantee documented
B3.2: 0/4. No guarantor identified
B3.3: 0/2. No banking partner mentioned for €4.1M
B4 · Structure financière 5.0/15faible
B4.1: 3/4. 20-year CRE tariff, IRR not disclosed
B4.2: 0/4. Equity contribution not documented
B4.3: 2/4. No stress test, crowd share approximately 11%
B4.4: 0/2. taux de couverture de la dette not disclosed
B5 · Pré-commercialisation 10.0/10✓ max
  • CRE tender winner with a 20-year supplementary remuneration at 81.49 €/MWh
  • Permit purged of any appeals
  • Connection agreement signed in March 2026
B6 · Permis & Maturité 5.0/5✓ max

Permit purged of any appeals (May 2024), Enedis connection agreement in place, 35-year lease signed, construction started

B7 · Marché & Localisation 2.0/3
  • French renewable energy market established, revenues set by CRE tariff
  • Landes resource lower than PACA
  • Live data: stable trend
⚠ Alertes détectées · −5 pts déduits
Pas de financement bancaire −5 pts

Project of €4.1M (>€2M) with no banking partner documented in the file

Points forts
✓CRE supplementary remuneration over 20 years at 81.49 €/MWh
✓Permit purged of any appeals, connection agreement in place, construction in progress
✓Simple bond issued by a dedicated SPV
✓Enoé group backed by the iCON Infrastructure fund
✓Platform licensed as a PSFP with a low default rate
Risques identifiés
!No security interest or personal guarantee documented on the bond
!€4.1M financing plan not detailed (bank, equity)
!Ranking against any potential senior bank debt not specified
!Crowd amount below €500K: RF8 not applied despite absence of guarantee
!Risk of delay to the commissioning scheduled for December 2026
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.