La centrale agrivoltaïque de Puichéric, en Occitanie

Average
57
score / 100
Yield
6.5%/yr
Duration
48 months
Min. ticket
—
Amount raised
854 k€
Invest →
À propos

Bond financing for SLR1, owner of a 5 MWp agrivoltaic plant on organic arboriculture greenhouses in Puichéric (Aude). The operator is Solarhona, a CNR subsidiary. The project is a winner of the CRE PPE2 Bâtiments tender (March 2024). Works started in autumn 2025, commissioning planned for winter 2026. Joint offering with Lendopolis.

Plateforme · 19.8/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Maximum status on the grid
A2 · Track Record 4.8/6bon
  • Default 0.34% (<1%) → 6/6
  • Delay 0.41% (<5%) → 6/6
  • Actual return vs announced: not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8
A3 · Rigueur de sélection 2.0/4
  • Proven specialisation in renewable energy with €420M raised since 2014
  • No selection rate published nor detailed description of the analysis committee
A4 · Santé financière 3.0/4bon
  • Backed by 123 IM group, 90 employees, operational platform since 2014
  • Acquisition of Lendopolis in 2024 = expansion, not distress
  • Non-listed group/tier 1 institutional → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → reflection period + continuity plan mandatory (1 pt)
  • Third-party escrow account for payments documented (1 pt)
  • No secondary market mentioned (0 pt)
Projet · 37.0/75 (42.0 brut, red flags −5)
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5: Fixed-rate simple bond 6.5%, French law
B1.2: 3/3: Dedicated société dédiée (SPV) SLR1, distinct from the operator
B1.3: 1/2: Ranking not documented, any senior debt not specified
B2 · Opérateur & Track record 11.0/15
B2.1: 4/4: CEO Maëlle Vanderkam appointed, publicly identifiable profile
B2.2: 4/5: 11.6 MWc in operation, 16 plants
B2.3: 1/3: Lendosphere track record of Solarhona not documented
B2.4: 2/3: No proceedings reported, financial statements not provided
B3 · Garanties & Sûretés 0.0/15faible
B3.1: 0/9: No collateral or guarantee mentioned in the file
B3.2: 0/4: No guarantor identified
B3.3: 0/2: No bank loan documented
B4 · Structure financière 5.0/15faible
B4.1: 3/5: CRE PPE2 tariff secured, project IRR not disclosed
B4.2: 1/4: SLR1 equity contribution not quantified
B4.3: 1/4: No stress test, revenues contracted
B4.4: 0/2: taux de couverture de la dette not disclosed
B5 · Pré-commercialisation 10.0/10✓ max

Winner of the CRE PPE2 tender (long-term contract), ENEDIS connection agreement signed, planning permits obtained, works in progress

B6 · Permis & Maturité 5.0/5✓ max

All permits obtained, works started in autumn 2025, ENEDIS connection agreement signed, exemption from environmental impact study by DREAL

B7 · Marché & Localisation 2.0/3
  • French renewable energy market established, Aude very sunny
  • Trend stable according to live data, comparables not available
  • Score adjusted thanks to live data: stable trend, no strong growth
⚠ Alertes détectées · −5 pts déduits
Aucune garantie réelle sur ce projet −5 pts

No guarantee documented on a bond of 854 000 €: neither collateral nor surety.

Points forts
✓Solid institutional shareholding: CNR, Caisse des dépôts, Crédit Agricole
✓Project winner of the CRE PPE2 tender, regulated revenues
✓Permits obtained, ENEDIS connection under agreement, works in progress
✓Issuer: dedicated SPV SLR1, fixed-rate simple bond
✓PSFP-licensed platform with a low historical default rate
Risques identifiés
!No guarantee or surety from the parent company mentioned in the file
!Financing plan, senior debt and DSCR referred to the FICI, not provided
!Risk of delay in commissioning scheduled for winter 2026
!Capital repaid in fine after 4 years, total illiquidity
!Live market data focused on Lyon, not representative of the Aude
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.