← Retour aux projets
Projet Eolien De Pluduno Dans Les Côtes-d'Armor
LE
Lendosphere Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Projet Eolien De Pluduno Dans Les Côtes-d'Armor

Average
60
score / 100
Yield
7.5%/yr
Duration
24 months
Min. ticket
1 k€
Amount raised
50 k€
Invest →
À propos

Crowdfunding in development phase of a wind farm with 2 turbines (9 to 11.4 MW) at Pluduno (Côtes-d'Armor, Brittany), led by Gaïa Energy Systems (NGE group subsidiary) in partnership with SEM Energies 22 and the municipality of Val-d'Arguenon. The environmental authorisation request was filed August 2025; commissioning is estimated early 2029. The obligation is accompanied by a bank GAPD and a conditional success premium of 0.5%/year.

Plateforme · 19.8/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Maximum status on the grid
A2 · Track Record 4.8/6bon
  • Default 0.34% (<1%) → 6/6
  • Delay 0.41% (<5%) → 6/6
  • Actual return vs announced: not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8
A3 · Rigueur de sélection 2.0/4
  • Proven specialisation in renewable energy with €420M raised since 2014
  • No selection rate published nor detailed description of the analysis committee
A4 · Santé financière 3.0/4bon
  • Backed by 123 IM group, 90 employees, operational platform since 2014
  • Acquisition of Lendopolis in 2024 = expansion, not distress
  • Non-listed group/tier 1 institutional → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → reflection period + continuity plan mandatory (1 pt)
  • Third-party escrow account for payments documented (1 pt)
  • No secondary market mentioned (0 pt)
Projet · 40.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple obligation fixed rate, clear French law
B1.2: 2/3 - Direct loan Gaïa Energy Systems, well documented
B1.3: 1/2 - Unsubordinated rank but mortgage absent; bank GAPD present
B2 · Opérateur & Track record 10.0/15
B2.1: 4/4 - Managing Director Thibault Rebourcet appointed, identifiable
B2.2: 4/5 - Founders >120 MW already developed/operated, shareholder NGE
B2.3: 1/3 - First operation on Lendosphere, reputation verifiable elsewhere
B2.4: 1/3 - Company created 2020, financial statements not provided, gearing unknown
B3 · Garanties & Sûretés 9.0/15
B3.1: 7/9 - Bank GAPD on capital and interest, bank not named
B3.2: 1/4 - Partner bank not identified, guarantor strength not verifiable
B3.3: 1/2 - Bank presence implicit (GAPD), but bank not named
B4 · Structure financière 6.0/15faible
B4.1: 2/5 - Development project without revenues or signed PPA, IRR not communicated
B4.2: 2/4 - Operator contribution not quantified; SEM and municipality partners suggest capital contribution
B4.3: 0/4 - No stress test, revenues non-existent (development phase)
B4.4: 2/2 - NGE group solid, institutional structure reassuring
B5 · Pré-commercialisation 4.0/10faible
  • ENERGY grid: Licence under instruction (EIA filed August 2025, not yet obtained)
  • No PPA signed
  • Connection not confirmed. → 4/10
B6 · Permis & Maturité 1.0/5faible
  • EIA filed August 2025, public consultation phase planned
  • Licence not obtained
  • Advanced development phase but without authorisation. → 1/5
B7 · Marché & Localisation 2.0/3
  • French renewable energy market in growth, PPE3 adopted February 2026
  • Brittany favourable to wind energy
  • Temporary overcapacity risk RTE noted
  • Established market → 2/3
Points forts
✓Bank GAPD on capital and interest provides real protection to investors.
✓Gaïa Energy Systems backed by NGE group, >120 MW developed by founding team.
✓Strong institutional involvement: SEM Energies 22, municipality Val-d'Arguenon in capital.
✓French renewable energy market in growth, PPE3 adopted, regulatory framework restored.
✓Lendosphere platform licensed PSFP AMF, solid renewable energy track record.
Risques identifiés
!Project in early development phase: environmental authorisation not obtained, commissioning 2029.
!Absence of signed PPA or regulated tariff: future revenues not contractualised at this stage.
!Risk of EIA rejection by prefect: success premium (0.5%/year) not acquired.
!Bank issuing the GAPD not identified: guarantor strength not verifiable.
!Fundraising amount very limited (50,000€): finances only symbolic fraction of total project.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.