← Retour aux projets
Centrale Solaire Le Pal 2 A
LE
Lendosphere Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Centrale Solaire Le Pal 2 A

Strong
73
score / 100
Yield
7.5%/yr
Duration
42 months
Min. ticket
—
Amount raised
250 k€
Invest →
À propos

Financing of a photovoltaic power plant on parking canopies (1.29 MWc) for the Le Pal leisure park in Saint-Pourçain-sur-Besbre (Allier), realised by Photosol SPV 45, subsidiary of Photosol (Rubis group). Project winner of a CRE call for proposals, currently under construction, commissioning planned for autumn 2026. Collection restricted to residents of Allier and bordering departments.

Plateforme · 20.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF fonds propres-2023-22 in force since November 2023
  • Also registered statut réglementaire CIP and IFP with registre ORIAS
  • Maximum regulatory status achieved
A2 · Track Record 5.0/6bon
  • Default 0.0% → 6/6
  • Delay 0.35% (<5%) → 6/6
  • Actual vs announced return not explicitly communicated → 0/6
  • A2 = (6×0.5)+(6×0.3)+(0×0.2) = 4.8 → rounded to 5
A3 · Rigueur de sélection 2.0/4
  • Selection process mentioned implicitly (700 fundraisings over €400M, 0% default)
  • Selection rate not explicitly published in available data
A4 · Santé financière 3.0/4bon
  • Backed by 123 Investment Managers group since 2021, >10 years in existence (founded 2014), healthy growth, no platform distress signal
  • Non-listed institutional group → 3 pts
A5 · Protection investisseurs 2.0/3
  • agrément AMF licensed → 4-day reflection period + mandatory continuity plan (1 pt)
  • Lendopolis acquisition November 2024 suggests segregated payment infrastructure (1 pt)
  • Secondary market not documented (0 pt)
Projet · 53.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple bond fixed rate, French law
B1.2: 2/3 - Dedicated société dédiée (SPV) Photosol société dédiée (SPV) 45, distinct issuer, French law
B1.3: 1/2 - Simple bond with no known senior debt, de facto rank 1st not registered
B2 · Opérateur & Track record 12.0/15bon
B2.1: 4/4 - Photosol, identifiable managers, transparent company, Rubis subsidiary
B2.2: 4/5 - Founded 2008, 1.4 GWc in operation/construction, ~10-50 MWp connected
B2.3: 2/3 - Previous transactions on Lendosphere (Le Pal 1 referenced)
B2.4: 2/3 - Listed Rubis group, sound balance sheet; société dédiée (SPV) new entity, société dédiée (SPV) gearing unknown
B3 · Garanties & Sûretés 8.0/15
B3.1: 5/9 - Joint and several guarantee from Cilaos 2 / Photosol SAS implicit via group structure; no mortgage or pledge documented
B3.2: 2/4 - Intermediate holding Cilaos 2, fonds propres not disclosed, Rubis solid
B3.3: 1/2 - Banking partner unnamed, amount <€2M
B4 · Structure financière 10.0/15
B4.1: 4/5 - Winner CRE call for proposals, guaranteed regulated tariff, estimated IRR 8-10%
B4.2: 3/4 - Photosol Rubis group, substantial capital contribution assumed on ongoing project
B4.3: 2/4 - CRE revenues contractualized mitigate stress; no documented stress test
B4.4: 1/2 - Estimated taux de couverture de la dette 1.2-1.5 on CRE revenues; precise data absent
B5 · Pré-commercialisation 8.0/10bon
  • Winner PPE.2 CRE call for proposals. regulated tariff applicable, permit fully expired implicit, grid connection underway (active construction autumn 2026)
  • Long-term CRE electricity sales contract secured
B6 · Permis & Maturité 4.0/5bon
  • Power plant under active construction (Pal 1 and Pal 2 construction documented), official call for proposals winner
  • Building permit obtained, possible appeals not excluded
  • Commissioning autumn 2026
B7 · Marché & Localisation 3.0/3✓ max
  • French renewable energy market in strong growth (CAGR 18.84% to 2031), guaranteed CRE tariff 20 years, no spot market price exposure
  • Score adjusted thanks to live data: market_trend=rising, 20-year CfD tariffs confirmed
Points forts
✓Photosol operator Rubis group subsidiary (listed), 17 years renewable energy experience, financial strength.
✓CRE call for proposals winner project, long-term electricity revenue guaranteed by the State.
✓Power plant under active construction, commissioning autumn 2026, low development risk.
✓7.5% per annum rate in line with ENERGY market norm; AMF PSFP licensed platform zero defaults.
✓Long-term partnership with Le Pal confirmed, extension of an existing operational project.
Risques identifiés
!Documented guarantees limited: no mortgage or pledge registered on SPV.
!SPV Photosol SPV 45 new entity, balance sheet not disclosed in file.
!Possible grid connection delays: 24 GW awaiting connection in France.
!Collection restricted to residents of Allier and bordering departments, very restricted liquidity.
!Modest collection amount (€250,000), crowd share in total financing not specified.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.