Enerfip Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Port-la-Nouvelle – QAIR CS PLNPORT

Strong
71
score / 100
Yield
6.0%/yr
Duration
18 months
Min. ticket
50 €
Amount raised
5 M€
Invest →
À propos

Bridge financing of 5 M€ to cover development costs for an 8.85 MWc photovoltaic project located in the Port-la-Nouvelle port area (Aude, 11). The issuer is project company QAIR CS PLNPORT, 100% owned by QAIR France, itself a subsidiary of QAIR International. The project is in final development: permit obtained September 2025, final December 2025, land (COT) under signature, tariffs not yet secured, COD planned March 2027.

Plateforme · 23.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF currently valid, fonds propres-2022-2 licence verified
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default rate 0.00% → 6/6
  • Delay rate 0.32% (<5%) → 6/6
  • Average realised return 7.95% compliant with announced renewable energy range (5-9%) → 6/6
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 3.0/4bon
  • Documented selection process (published risk score 2/5, internal committee), but overall selection rate not explicitly published
  • Leading renewable energy platform in France since 2014, 537 projects financed
A4 · Santé financière 3.0/4bon
  • Independent profitable platform (net income approximately 600K€ 2022), more than 10 years in existence, 30-50 employees, consistent growth
  • Acquisition of Lumo end of 2025
  • No listed institutional shareholder → 3 points vs 4 points for group subsidiary
A5 · Protection investisseurs 3.0/3✓ max
  • agrément AMF licence → reflection period 4 days plus mandatory continuity plan (1 point)
  • Segregated accounts required by agrément AMF status (1 point)
  • Enerdeal secondary market operational since 2023 (1 point)
Projet · 48.0/75
B1 · Instrument & Structure 9.0/10bon
B1.1: 5/5 - Simple obligations fixed rate, French law
B1.2: 3/3 - Dedicated société dédiée (SPV) QAIR CS PLNPORT, clear French law
B1.3: 1/2 - Senior ranking claimed, no existing senior debt, not formally registered
B2 · Opérateur & Track record 11.0/15
B2.1: 4/4 - Appointed managers (Louis Blanchard CEO, Jochen Nüssle CIO), identifiable LinkedIn profiles
B2.2: 4/5 - 1.7 GW in operation, 780 employees, but 0 MW connected on QairFrance own
B2.3: 2/3 - Positive Enerfip history, >50M€ repaid
B2.4: 1/3 - QAIR France recurring losses (-5.7M€ 2024), equity declining (14M€), high gearing
B3 · Garanties & Sûretés 10.0/15
B3.1: 7/9 - GAPD of QAIR France (autonomous demand guarantee) plus pledge of 100% société dédiée (SPV) shares
B3.2: 2/4 - QAIR France equity 14M€ declining, recurring losses, gearing ~7.5x; support from QAIR International (119M€ group liquidity)
B3.3: 1/2 - Intended banking partner (90% senior debt) but not yet approved at this stage
B4 · Structure financière 8.0/15
B4.1: 3/5 - Tariff not secured, CRE application May 2026 planned; IRR not disclosed, revenues not contracted
B4.2: 2/4 - 10% equity operator planned; QAIR International commitment via CCA
B4.3: 2/4 - Indicative business plan over 21 years; stress test not presented but Loan-to-Cost (ratio prêt/coût total) low (<10% crowd)
B4.4: 1/2 - Post-financing taux de couverture de la dette not calculable at this pre-tariff stage
B5 · Pré-commercialisation 4.0/10faible
  • Permit obtained and final (no appeal December 2025)
  • CRE application May 2026 (tariff not secured)
  • COT not signed
  • Connection under examination
  • End of development phase without electricity sales contract - score 4/10
B6 · Permis & Maturité 4.0/5bon
  • Building permit obtained September 2025, no appeal December 2025
  • Connection under examination
  • COT not yet signed
  • Close to maximum score but land (COT) not yet executed - 4/5
B7 · Marché & Localisation 2.0/3
  • French renewable energy market in growth (trend: rising), healthcare investment volumes not relevant here
  • Solar in France supported by CRE
  • Unsecured tariff introduces uncertainty - 2/3
⚠ Alertes détectées · −3 pts déduits
Terrain pas encore acheté −3 pts

not applicable (ENERGY class, RF6 reserved RE-MDB only).

Points forts
✓QAIR group solid: 1.7 GW in operation, 780 employees, international presence.
✓More than 50 M€ already repaid to Enerfip without incident.
✓GAPD of QAIR France and pledge of 100% SPV shares as security.
✓Building permit final (no appeal since December 2025).
✓QAIR International group liquidity of 119 M€ as of June 2025 reassuring.
Risques identifiés
!Electricity purchase tariff not secured: CRE application planned May 2026, result uncertain.
!COT (port land) not yet signed at document date.
!QAIR France shows recurring losses (-5.7M€ 2024) and very high gearing (~7.5x).
!Bridge financing: repayment conditional on completion of senior bank debt (90%).
!Network connection under examination - risk of delay to COD (March 2027).
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.