Centrale solaire de Ségrie, dans la Sarthe

Strong
72
score / 100
Yield
6.5%/yr
Duration
54 months
Min. ticket
—
Amount raised
440 k€
Invest →
À propos

Partial financing of construction of a 4.72 MWc ground-mounted photovoltaic plant at Ségrie (Sarthe), developed by TSE via SEGRIE PV project company. The plant, winner of a CRE call for tenders with a 20-year complementary remuneration contract, will begin construction in Q4 2026. SEGRIE PV shareholders include TSE (51%), Banque des Territoires and Crédit Mutuel Impact.

Plateforme · 22.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • Valid agrément AMF AMF licence, licence fonds propres-2023-26 registered
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default 0.74% (<1% → 6 pts)
  • Delay rate 1.14% (<5% → 6 pts)
  • Realised yield 6.85%/year in progression, compliant with ENR standard (5-9%) → 6 pts
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 2.0/4
  • Strategic ENR refocusing in 2019 documented, suggesting rigorous selection committee
  • No selection rate published explicitly
  • Non-quantified process → 2 pts
A4 · Santé financière 4.0/4✓ max
  • Subsidiary of Lendosphère (123 IM Group, institutional), net result +434K€ in 2024, no losses since 2019, >5 years in existence, no platform distress signal
  • Maximum score
A5 · Protection investisseurs 2.0/3
  • Approved agrément AMF → 4-day cooling-off period + mandatory continuity plan (1 pt)
  • Segregated accounts mandated regulatory for all agrément AMF (1 pt)
  • Secondary market not documented in available data (0 pt)
Projet · 50.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple obligation fixed rate, French law
B1.2: 2/3 - Direct loan SEGRIE PV project company, French law
B1.3: 1/2 - Priority ranking not formally registered at file date
B2 · Opérateur & Track record 12.0/15bon
B2.1: 4/4 - TSE, founders Debonnet/Lambert appointed, public profiles
B2.2: 5/5 - >50 MWc connected (152 MWc Marville), 103.5 GWh produced 2025
B2.3: 2/3 - Operation in progress with no incident reported
B2.4: 1/3 - TSE balance sheet not provided, holding financed by Eurazeo/BPI/CA but detailed data absent
B3 · Garanties & Sûretés 7.0/15faible
B3.1: 6/9 - Pledge of SEGRIE PV shares probable via société dédiée (SPV); specific guarantees not documented in file
B3.2: 2/4 - Institutional shareholders (Banque des Territoires, Crédit Mutuel Impact) but guarantor solidity not formalised
B3.3: 1/2 - Institutional banking partners identified but amounts not specified
B4 · Structure financière 9.0/15
B4.1: 4/5 - CRE contract 20 years, project IRR estimated 8-10% with regulated tariff
B4.2: 2/4 - Equity contributions TSE/institutional not quantified
B4.3: 2/4 - Revenues contracted over 20 years offset absence of stress test
B4.4: 1/2 - taux de couverture de la dette not provided; contractualised PPA revenues reassuring
B5 · Pré-commercialisation 8.0/10bon
  • Licence purged, CRE 7th call for tenders Ground winner, 20-year complementary remuneration contract signed
  • Network connection not yet confirmed
  • Construction start Q4 2026
B6 · Permis & Maturité 4.0/5bon
  • CRE call for tenders winner, building permit likely obtained but challenge timeframes possible
  • Construction start Q4 2026, network connection not yet confirmed
B7 · Marché & Localisation 2.0/3
  • French renewable energy market in strong growth, solid regulatory support
  • 20-year CRE contract independent of local real estate market
  • Score adjusted thanks to live data: SEGRIE real estate sector not relevant for ENERGY; favourable national renewable market maintained at 2/3
Points forts
✓TSE: major solar developer, 103.5 GWh produced in 2025, solid track record
✓20-year CRE contract secures revenues for entire loan duration
✓Institutional shareholders: Banque des Territoires and Crédit Mutuel Impact
✓130M€ raised in 2023 (Eurazeo, Crédit Agricole, BPI France) strengthens solidity
✓Site valorising brownfield (former landfill): positive environmental impact
Risques identifiés
!Bond loan specific guarantees not documented in published file
!Construction not started (Q4 2026): risk of costs, delays and commissioning
!Network connection not yet confirmed by network operator
!SEGRIE PV overall financing plan not provided; equity portion unknown
!Rate of 6.5%/year within renewable norms but 54-month duration extends risk exposure
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.