← Retour aux projets
Centrale solaire flottante de Chevenon
LE
Lendopolis Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Centrale solaire flottante de Chevenon

Very Strong
75
score / 100
Yield
6.0%/yr
Duration
11 months
Min. ticket
—
Amount raised
1 M€
Invest →
À propos

Bridge financing of 1M€ (out of total 4M€) for construction of a 33.85 MWc floating photovoltaic power plant at Chevenon (Nièvre), developed by Elements. The project benefits from a CRE revenue supplement contract over 20 years (PPE2 call for tenders winner). Repayment planned upon implementation of long-term bank financing by 2028.

Plateforme · 22.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • agrément AMF licence AMF in effect (registered as IFP then licensed as agrément AMF under EU regulation 2020/1503)
  • Maximum regulatory status applicable in France
A2 · Track Record 5.0/6bon
  • Default <1% on renewable energy portfolio (6/6)
  • Delays >90 days estimated at 5-15% on several solar projects (4.5/6)
  • Actual return in line with stated rates (6/6)
  • Weighted: 6×0.5 + 4.5×0.3 + 6×0.2 = 5.55 → 5/6
  • Statistics published regularly on the website
A3 · Rigueur de sélection 3.0/4bon
  • Renewable energy selection process documented and rigorous (technical committee, regulatory verification, KYC on project sponsor)
  • Selection rate not explicitly published
  • Strong sectoral specialisation compensates
A4 · Santé financière 4.0/4✓ max
  • Subsidiary of La Banque Postale group (French public bank, majority shareholder via KissKissBankBank & Co)
  • First-rank institutional backing, platform default risk near zero
  • Operating since 2014
A5 · Protection investisseurs 2.0/3
  • 4-day reflection period plus agrément AMF business continuity plan (1/1)
  • Segregated accounts via third-party payment service provider La Banque Postale (1/1)
  • No documented operational secondary market (0/1)
Projet · 53.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple bond fixed rate, clear French law
B1.2: 2/3 - Dedicated société dédiée (SPV) ELEMENTS RESONANCE 2, issuer distinct from operator
B1.3: 1/2 - First-rank pledge of ELEMENTS RESONANCE 2 securities, not registered with conservatoire as of filing date
B2 · Opérateur & Track record 10.0/15
B2.1: 3/4 - Directors appointed (Cichostepski, Chazalet, Petit), profiles accessible
B2.2: 3/5 - 100 MW under operation/construction, <50 MWp connected documented
B2.3: 2/3 - Lendosphere track record documented, multi-platform presence
B2.4: 2/3 - BpiFrance shareholder, balance sheet not provided in detail
B3 · Garanties & Sûretés 7.0/15faible
B3.1: 6/9 - First-rank pledge of SAS ELEMENTS RESONANCE 2 securities, registered
B3.2: 1/4 - Holding financial information limited in the filing
B3.3: 0/2 - Senior bank debt being secured, not finalised; project <2M€ no RF2
B4 · Structure financière 13.0/15bon
B4.1: 5/5 - CRE PPE2 contract 20 years, secured tariff, attractive project IRR with regulated PPA
B4.2: 4/4 - Elements equity 5% plus RCF 80%, structure temporarily bridged
B4.3: 3/4 - CRE contract secures revenues over 20 years, limited production stress
B4.4: 1/2 - Estimated taux de couverture de la dette correct post-connection, revenues contractualised
B5 · Pré-commercialisation 8.0/10bon
  • CRE PPE2 contract 20 years signed, CRE call for tenders winner
  • Building permit obtained, service start October 2027
  • Regulated PPA guaranteed
  • Network connection not yet confirmed by grid operator
B6 · Permis & Maturité 4.0/5bon
  • Building authorisation obtained (CRE winner, construction underway as planned), potential appeal deadlines not documented
  • Service start planned October 2027
  • Network connection in course of confirmation
B7 · Marché & Localisation 3.0/3✓ max
  • French renewable energy market in strong growth
  • 20-year CRE contract secures electricity sale tariff
  • Floating technology under active development, national demand supported
  • No market price risk
Points forts
✓CRE PPE2 contract 20 years securing the tariff for electricity produced.
✓Reinforced shareholding: BpiFrance, 8 Crédit Agricole regional banks in Elements capital.
✓First-rank pledge of ELEMENTS RESONANCE 2 securities put in place.
✓Short bridge structure (11 months) towards quasi-confirmed senior bank debt.
✓Documented annual production (37 GWh), measured environmental impact.
Risques identifiés
!Senior bank debt (~23.8M€) being secured, not finalised at fundraising.
!Service start planned October 2027, construction delay risks not covered.
!Financial strength of holding ELEMENTS RESONANCE 2 not documented in the filing.
!Floating technology on gravel pits: specific technical and operational risks.
!Repayment conditional on long-term financing being put in place by 2028.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.