← Retour aux projets
Serres agrivoltaïques des Planquettes, en Tarn-et-Garonne
LE
Lendopolis Renewable energy Financé
Ce projet est clôturé. L'analyse ci-dessous reflète les informations disponibles au moment de la souscription et n'a pas été mise à jour.

Serres agrivoltaïques des Planquettes, en Tarn-et-Garonne

Strong
74
score / 100
Yield
6.5%/yr
Duration
48 months
Min. ticket
—
Amount raised
711 k€
Invest →
À propos

Partial financing of construction of 4.6 MWc agrivoltaic greenhouses at Montauban (Tarn-et-Garonne), developed by Urbasolar (division of Axpo). The project is winner of a CRE call for tenders with a remuneration supplement contract over 20 years. The borrower is the SPV URBA 475, 100% subsidiary of Urbasolar/Axpo. Commissioning planned for October 2026.

Plateforme · 22.0/25
A1 · Statut réglementaire 8.0/8✓ max
  • Valid agrément AMF AMF licence, licence fonds propres-2023-26 registered
  • Maximum score
A2 · Track Record 6.0/6✓ max
  • Default 0.74% (<1% → 6 pts)
  • Delay rate 1.14% (<5% → 6 pts)
  • Realised yield 6.85%/year in progression, compliant with ENR standard (5-9%) → 6 pts
  • A2 = (6×0.5 + 6×0.3 + 6×0.2) = 6/6
A3 · Rigueur de sélection 2.0/4
  • Strategic ENR refocusing in 2019 documented, suggesting rigorous selection committee
  • No selection rate published explicitly
  • Non-quantified process → 2 pts
A4 · Santé financière 4.0/4✓ max
  • Subsidiary of Lendosphère (123 IM Group, institutional), net result +434K€ in 2024, no losses since 2019, >5 years in existence, no platform distress signal
  • Maximum score
A5 · Protection investisseurs 2.0/3
  • Approved agrément AMF → 4-day cooling-off period + mandatory continuity plan (1 pt)
  • Segregated accounts mandated regulatory for all agrément AMF (1 pt)
  • Secondary market not documented in available data (0 pt)
Projet · 52.0/75
B1 · Instrument & Structure 8.0/10bon
B1.1: 5/5 - Simple bond at fixed rate, French law
B1.2: 2/3 - Dedicated société dédiée (SPV) URBA 475, 100% subsidiary of Urbasolar, French law
B1.3: 1/2 - Simple bond without known senior debt, unregistered de facto ranking
B2 · Opérateur & Track record 14.0/15bon
B2.1: 4/4 - Urbasolar named, identifiable management, Axpo group referenced
B2.2: 5/5 - >50 MWc connected (1.6 GW in operation, 750 power plants)
B2.3: 2/3 - Operator present on Lendopolis, 1 ongoing operation without incident
B2.4: 3/3 - Subsidiary of Axpo, no insolvency proceeding, solid balance sheet
B3 · Garanties & Sûretés 6.0/15faible
B3.1: 6/9 - Pledge of URBA 475 shares probable but not documented; 20-year CRE contract constitutes an asset
B3.2: 1/4 - Project société dédiée (SPV), equity capital not detailed
B3.3: 0/2 - No identified banking partner, amount <2M€ therefore RF2 not triggered
B4 · Structure financière 11.0/15
B4.1: 4/5 - Regulated CRE 20-year rate obtained, estimated IRR 8-10%
B4.2: 3/4 - Axpo/Urbasolar contributes substantial equity, low crowd ratio on 4.6 MWc
B4.3: 3/4 - Revenues contracted under 20-year CRE absorb -20% stress
B4.4: 1/2 - Estimated taux de couverture de la dette 1.2-1.5 post-financing
B5 · Pré-commercialisation 8.0/10bon
  • Winner of CRE 11th call, 20-year remuneration supplement contract obtained
  • Permit granted, construction underway
  • Network connection not yet confirmed by operator. → 8 points
B6 · Permis & Maturité 4.0/5bon
  • CRE authorisation obtained, winner of call for tenders, construction underway
  • Network connection being confirmed (commissioning October 2026). → 4 points
B7 · Marché & Localisation 1.0/3faible
  • Score adjusted thanks to live data: secondary logistics market in decline (-64% YoY)
  • French renewable energy market positive but Tarn-et-Garonne secondary; CRE rate guarantees revenue independent of spot market. → 1 point
Points forts
✓Operator Urbasolar: 750 power plants in operation, 1.6 GW, subsidiary of Axpo (Switzerland).
✓20-year CRE contract obtained: revenues guaranteed by the State for the entire duration.
✓Lendopolis platform licensed by AMF PSFP, excellent renewable energy track record (0.74% default rate).
✓Dedicated SPV URBA 475, clear legal structure under French law.
✓Construction already started, commissioning planned for October 2026.
Risques identifiés
!Specific guarantees for the benefit of bondholders not documented in the file.
!No identified banking partner in the presentation file.
!Secondary logistics market in sharp deceleration Q1 2026 (-64% YoY).
!Network connection and post-financing DSCR not detailed in the document.
!Commissioning October 2026: construction delay risk not documented.
⚠ Avertissement sur les risques

Investir en crowdfunding comporte un risque de perte partielle ou totale du capital, ainsi qu'un risque d'illiquidité. Selon le baromètre France FinTech / Forvis Mazars 2025, 25 à 30 % des projets accusent un retard de plus de 6 mois et 4 à 6 % entraînent une perte définitive. Ne placez jamais plus de 5 à 10 % de votre patrimoine en crowdfunding et diversifiez sur au moins 10 projets. CrowdPickr est un service d'information indépendant, non agréé en tant que conseiller en investissement. Les analyses présentées ne constituent pas un conseil en investissement personnalisé.